Industrial project delivery manager. I contribute to service and rebuild center concepts and coordinate construction, investment budgets, equipment, permitting and operational readiness.

Azamat Tleushev — industrial project development: CRC Astana construction and industrial workshop

CRC Astana — illustrative project montage based on project materials.

CONCEPT TO DELIVERY

From process concept to an industrial facility

Illustrative three-dimensional concept of CRC workshop organization
Conceptual 3D model — not an as-built technical drawing
High-level overview of CRC service center process organization
High-level process overview — reduced-resolution illustrative preview

CRC is an investment project of KOMEK Machinery Kazakhstan. Materials demonstrate professional experience only. Publication of original project images and materials is subject to rights-holder permission; detailed layouts and technical documentation are not disclosed.

KOMEK MACHINERY KAZAKHSTAN · CRC

My responsibilities on the CRC project

My practical experience includes the new Komatsu Component Rebuild Center in Astana, an investment project of approximately USD 20 million. Below are the main areas of my responsibilities.

01

My role in CRC

I actively participate in developing and adapting the technological concept for the new Komatsu Component Rebuild Center (CRC) in Astana alongside Japanese technical specialists and Komatsu CIS consultants, including Sergey Yuryevich Zavivalov, the lead concept developer. I contribute to production-area planning, technological workflows, equipment layout and engineering infrastructure requirements. On behalf of KOMEK Machinery Kazakhstan, I coordinate project delivery, including design and construction, CAPEX budgeting and control, equipment procurement, contractors, permitting and preparations for commissioning and operational launch.

Concept development is a collaborative international effort led by Sergey Zavivalov. I do not claim sole or principal authorship.

02

Project delivery and construction coordination

I coordinate CRC project execution, from engineering decisions and construction through readiness for facility handover. I work with designers, construction supervision, the general contractor, suppliers and internal stakeholders. My responsibilities include milestones, construction and utilities readiness, change coordination and project risks.

Specialist contractors perform construction works. My role is project-side management and coordination, not independent provision of regulated construction services.

03

CAPEX and investment planning

I prepared and calculated the CRC project budget for shareholder review, covering construction, process equipment and start-up activities. My work includes cost planning, procurement coordination, budget constraints and change management. The overall investment scale is approximately USD 20 million.

The figure describes the investment project, not my personal consulting contract value.

04

Equipment and production processes

I contribute to equipment requirements, supplier engagement and coordination of equipment selection. I help plan equipment layouts and the civil, power, cooling, compressed-air and other utilities needed for installation and testing. The facility covers repair, rebuilding, diagnostics and testing of heavy-equipment components.

Detailed technical decisions are coordinated with specialists, concept developers and equipment manufacturers.

05

Permits and infrastructure

I coordinate project approvals, permitting workflows and relationships with relevant public and utility organizations. This includes connections for electricity, water supply, wastewater and other infrastructure required to operate the facility.

Regulated approvals and technical works are performed or issued by competent authorized parties.

06

Commissioning and operational readiness

I coordinate the sequence from construction completion through equipment installation, commissioning preparation and phased start-up. This includes aligning activities and readiness across multiple workstreams.

As of October 2026 the CRC project is still being delivered and prepared for launch. It is not described as already commissioned.

07

Wider professional background

My engineering and management background includes equipment operations, industrial infrastructure and technical project coordination. This helps me approach service centers as future operating businesses, not merely as construction projects.